Customer
A large, multinational company in Canada that handled construction products within the equipment industry.
Problem
Moving loaded pallets through the warehouse and factory was inefficient and caused multiple safety concerns.
Solution
Power Pack worked with the company to design a solution that shifted the fully loaded pallet lines from three different areas within the factory to a single wrapping and loading area.
System
Three pallet-loading lines were built using three belt-over-roller conveyors and one chain-driven live roller conveyor with a chain transfer. Each line transferred the pallet to a flat wire mesh rotator which then transferred the fully loaded pallet to an exit location for shrink wrapping. The completed system improved the previous use of conveyors, reduced manual activity, and streamlined product flow.
Related Conveyors:
Belt-over-roller conveyor
Chain-driven live roller conveyor
Flat wire mesh rotator